AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |
Back to Blog
Edison township building department10/18/2023 If you have any questions or comments, please feel free to reach out to our office.The heating, ventilation and air conditioning system will be dedicated for a sports area with high occupancy, as well as providing traditional systems for office and storage areas, according to the documents. In order to aid you in the inspection processes and to minimize the needed for multiple inspections, we have prepared a memo. This amount will be coordinated with the applicant prior to the approval of the Site Improvement Permit. Engineering Inspection Escrow must be posted with the Department, equal to 5% of the overall cost of construction, or $500, whichever is greater. This includes additional fees for plan revisions, as well as, charging for inspection time. ![]() If the work is not ready at the time of inspection, the inspection will be failed and you will be required to reschedule the inspection with photographs demonstrating the work has been completed.Īs of June 20, 2022, a new fee schedule started. Therefore all work to be inspected shall be ready prior to 8am the day of the inspection. The inspections will typically be performed between the hours of 8am and 2pm. Inspection requests must be submitted a minimum of 2 business days prior to the inspection. ![]() ![]() In order to schedule an inspection you may do one of the follow ing things:Įmail the inspection request formto come in person to schedule an inspection. Please be aware that our process of scheduling Engineering Inspections has changed. *Required for New Single Family Home, Reconstructions, Change or Expansion of use.
0 Comments
Read More
Leave a Reply. |